- 10 CFR Part 50 - Applications for Licenses, Certifications, and . . .
(3) Each applicant for a construction permit under this part, or an early site permit, combined license, or manufacturing license under part 52 of this chapter, shall, upon notification by the Atomic Safety and Licensing Board appointed to conduct the public hearing required by the Atomic Energy Act, update the application and serve the updated
- NUREG BR-0298 Rev 2 Nuclear Power Plant Licensing Process. - NRC
Consequently, the agency holds numerous public meetings during the course of the licensing process, and the law requires that the NRC must hold a public hearing before issuing a construction permit, early site permit, or combined license for a nuclear plant
- Available NRC Licensing Pathways and Associated Hearing Processes
Part 50 Construction Permit Operating License o Part 52 Design Certification o Part 52 Early Site Permit (ESP) o Part 52 Combined License (COL) • Available Hearing Processes o Contested Hearing o Mandatory Hearing o ITAAC Hearing Agenda 2 •
- FOR 10 CFR PART 50 APPLICATIONS FOR LICENSES, CERTIFICATIONS, AND . . .
Under 10 CFR Part 50, before a company or other entity can build a nuclear power plant or non-power production or utilization facility (NPUF) at a particular site, it must obtain a construction permit from the NRC Subsequently, an operating license must be obtained from the NRC before an applicant can operate the facility
- Nuclear Regulatory Commission §50 - GovInfo
Nuclear Regulatory Commission §50 59 operating license or an amendment to a construction permit or operating li-cense without a hearing, upon 30-days’ notice and publication once in the FED-ERAL REGISTER of its intent to do so (3) If the Commission finds, in an emergency situation, as defined in §50 91, that no significant hazards con-
- Nuclear Power Plant Licensing Process - wyoleg. gov
An application for a combined license under 10 CFR Part 52 can incorporate by reference a design certification and or an early site permit The advantage of this approach is that the issues resolved during the design certification rulemaking and the early site permit hearing processes are precluded from
- 10 CFR 50. 30 -- Filing of application; oath or affirmation.
The holder of a construction permit for a production or utilization facility shall, at the time of submission of the final safety analysis report, file an application for an operating license
- Backgrounder on Nuclear Power Plant Licensing Process
Currently operating nuclear power plants were licensed under a two-step process described in Title 10 of the Code of Federal Regulations (10 CFR) under Part 50 This process requires both a construction permit and an operating license
- Oklo Inc. - Regulatory
Public hearing: A public hearing is held before a construction permit is issued Operating license application: The same steps are then required to be repeated for submittal, review, and approval of an operating license application 10 CFR Part 52 licensing approach
- 10 CFR § 50. 57 - Issuance of operating license. 1
1 The Commission may issue a provisional operating license pursuant to the regulations in this part in effect on March 30, 1970, for any facility for which a notice of hearing on an application for a provisional operating license or a notice of proposed issuance of a provisional operating license has been published on or before that date
|
|